Systems and Generation Study
Review the short scope, likely inputs and boundary before requesting this starting point.
Compare all service optionsBF–01Survey
BF–02Reduce
BF–03Systems
BF–04Manage
Scope-based feeConfirmed after the survey
Test what the roof, the services and the frontage can actually take.
Fee pending: final scope and fee follow the survey.
Request this scope
The service becomes directly purchasable when an approved WooCommerce price and engagement terms are added.
What this helps decide
Decide which of water, light, generation and charging are feasible on this building, and in what order.
View likely inputs and outputs
Useful starting material
- The survey record
- Incoming electrical supply and metering
- Roof condition and visibility from the street
What this can clarify
- Rainwater capture and reuse options
- Lighting and controls approach
- Photovoltaic and charge-point feasibility notes
Where this scope fits
Best once demand has been reduced, so nothing is sized against a load that is about to change.
Scope boundary
Feasibility advice only; no electrical design, no structural certification, no approval outcome, and no yield or savings figure.