Skip to content
Beam / Reality Request a consultation

Systems and Generation Study

Review the short scope, likely inputs and boundary before requesting this starting point.

Compare all service options
BF–01Survey
BF–02Reduce
BF–03Systems
BF–04Manage

Scope-based feeConfirmed after the survey

Test what the roof, the services and the frontage can actually take.

Fee pending: final scope and fee follow the survey.

Request this scope

The service becomes directly purchasable when an approved WooCommerce price and engagement terms are added.

What this helps decide

Decide which of water, light, generation and charging are feasible on this building, and in what order.

View likely inputs and outputs

Useful starting material

  • The survey record
  • Incoming electrical supply and metering
  • Roof condition and visibility from the street

What this can clarify

  • Rainwater capture and reuse options
  • Lighting and controls approach
  • Photovoltaic and charge-point feasibility notes

Where this scope fits

Best once demand has been reduced, so nothing is sized against a load that is about to change.

Scope boundary

Feasibility advice only; no electrical design, no structural certification, no approval outcome, and no yield or savings figure.